-
Latest News
eNewsletter
Contributors
Sheffield Cycling Blogs
-
Meta
-
RSS Links
Archives
- September 2010
- August 2010
- July 2010
- June 2010
- May 2010
- April 2010
- March 2010
- February 2010
- January 2010
- December 2009
- November 2009
- October 2009
- September 2009
- August 2009
- July 2009
- May 2009
- April 2009
- March 2009
- February 2009
- January 2009
- December 2008
- November 2008
- October 2008
- September 2008
- August 2008
- July 2008
- June 2008
- May 2008
- April 2008
- March 2008
- February 2008
- January 2008
- November 2007
Getting to the Peak
This page was originally written by, and is dedicated to Jos Kingston, who campaigned tirelessly for sustainable access to the Peak District before her death in February 2007. Also dedicated to the memory of Rob Brock, who died in March 2009
Report on meeting with Sheffield Pedal Pushers (now CycleSheffield) – April 15th 200. This matter is now being taken forward by the Sheffield Cycling Coalition who’s members include CTC, CycleSheffield, Sustrans and Pedal Ready.
(Updated July 2005)
(Migrated to the Wiki, February 2007)
(Migrated to WordPress & updated, July 2010)
(Updated for Eastern moors partnership consultation, August 2010)
The meeting was held in Hathersage to focus specifically on the issue of cycle access to the Peak District. In addition to Pedal Pushers members, the meeting was attended by Alix Otten from Manchester CTC, and Rob Brock, sustainable Transport Officer for the YHA.
The emphasis of the Coalition differs from that of mountain bikers in its focus on routes which are suitable for families and touring cyclists, offering a reasonably level surface whilst carrying minimal or no motor traffic. Access to the Peak District for recreational cycling should not be dependent on travelling out by car; and the network of “joined-up” cycle routes, most especially in the parts of the Peak District closest to Sheffield, should be extended. It is evident from Derbyshire County Council’s “Cycle Derbyshire” map that these are distinctly lacking in the part of the Peak District closest to Sheffield.
With the opening of the Monsal Trail tunnels and the tremendous potential for additional sustainable tourist traffic that this represents, establishment of safe routes from Sheffield & Chesterfield to the trail, probably joining at Bakewell or the Country Bookstore, should be a priority.
Suggested routes
Main routes suggested in this area are (from north to south):
1. Loxley – Dungworth – Ughill – Strines – Moscar (using quiet roads and improved rights of way)
2. Stannington – Hollow Meadows – Moscar; with branch Rails – Rivelin Rocks – Townfield Head (using quiet roads and improved rights of way)
3. Peak Park Anniversary Route.
This solitary signed route into the Peak District from Sheffield is a big success but high speeds on Ringinglow Rd are a disincentive to new cyclists. There is no reason for traffic to travel at higher speeds on this road – most usage is for leisure purposes, the A6187/A625 being the main business route between the Hope Valley and Sheffield. One option would be to return this road to single track by fencing off one carriageway and making the other side available to walkers, cyclists and horse riders only.
Additionally in Sheffield, the route has been severed by a number of major works over the years:- Station Master plan, Winter Gardens, Barker’s Pool, Division Street, West One, Water Works at Bingham Park. Sevenstones is the current threat to the route.
It’s in the future still, but we need to plan with the council for a grand reopening of the route. All the stakeholders seemed keen to get this route on the map again and we think an updated reprint of the guide/ map and an official reopening ceremony would be a great success.
This could be linked in with our aspirations for a new Sheffield – Manchester route (NCN625) combining the Peak Park anniversary route with back lanes in the Peak Park as follows
Climb out of Sheffield using the Anniversary Route. Just beyond the Burbage Rocks parking spot take the right turn towards Bamford Moor. Take two right turns and arrive above Bamford on the A6013. Turn right, making use of the shared use pavement, and walk your bike over the Labybower Dam wall, then turning left to use the bridleway and taking the next right fork to reach the road towards Thorn hill. Take the narrow r. towards Aston running above the Hope Valley, and follow through until you drop down to the outskirts of Hope.
From Hope take the A6187 main road through Castleton to Mam Tor (improvements needed here) Then Rushup Edge, Slackhal, and minor roads Chinley (facilities) Towards Whitehouse there is a bridleway following the river. Follow this through to the old canal wharves, and you will come to the junction with the Peak Forest canal. Use canal towpaths to get to Manchester (see http://www.bikerides.dsracing.me.uk/ ) there are links to Fallowfield loop & TPT.
The establishment of a cycle route of this kind can be a driver for slower speeds and other road safety measures.
4. The Sheaf Valley route is also slowly taking place and will need to be linked in to other routes as they become available.
5. Ringinglow – Burbage Rocks – Fox House. Improvements are needed on Ringinglow Rd. Follow track from Burbage Rocks to Fox House
6. Ringinglow – Houndkirk Moor – Parson House (track)
7. Access to designated tracks over Longshaw Estate: e.g. Fox House – Grouse Inn
It appears that the National Trust is fearful that Longshaw could be overwhelmed by mountain bikes if cycling was permitted. However this would seem an unrealistic fear if cycling were permitted only on a limited number of designated tracks. The potential the Longshaw estate offers for the promotion and encouragement of recreation family cycling is tremendous. Mountain Biking has moved on from the early days and most MTB’ers are now aware of the need to stick to bridleways, give way to walkers etc.
8. Greenwood Farm (Hathersage Booths) – Grindleford Station. Rights to cycle along this track are also high on the wish list of cyclists living in Hathersage/Grindleford.
10. Totley – west of rifle range (existing track) – B6054
11. B6054 – Barbrook Resr – Big Moor – Ramsley Lodge
A small section of this route is a track where rights of way would need negotiating.
12. Tracks through Chatsworth
The same principles which apply to Longshaw apply equally to Chatsworth estate – tremendous potential for promotion of cycling. In particular the legitimisation of the route from Park Lodge past the house would remove a major barrier to cycling, and mitigate part of the effect of the enormous amount of motor traffic that Chatsworth attracts.
Comments accompanying these suggestions
1. All the above suggestions would benefit from greater detail, particularly where they involve redefining rights of way to permit cycling; or use of tracks where rights of way don’t currently exist. Best presentation would require larger-scale maps linking to smaller-scale maps with more detail.
2. A top priority is linking of routes to form a network.
3. Surfaces – signing which indicated suitability of surfaces for cycling would be beneficial. There are enormous differences between bridleway surfaces.
4. Additional routes: The track along the old railway line from Bamford – Ladybower can be integrated with the tracks and roads with restricted vehicle access round Ladybower/Derwent, and provide an excellent route for cyclists, which deserves to be well waymarked.
5. Another route which would lend itself to waymarking and special designation is New Mills – Hayfield – Chapel-en-le-Frith.
6. Although there are cycle lanes along parts of the main road through the Hope Valley, this is not pleasant cycling. Parents in the Hope Valley are concerned about the lack of safe cycleways for children attending Hope Valley College and are discussing plans in relation to this. Suggested that this should be separated lanes on each side of the road, so that cyclists can benefit from the “Tailwind” of traffic.
7. We are strongly against motorised vehicles in off-road contexts. This is counter to peaceful enjoyment of countryside and there are safety issues; environmental effects; rutting of surfaces etc. “Volunteer” resurfacing of routes by off-roaders might initially provide an improvement for cyclists, but this is likely to be short-lived where motorised off-road usage continues to expand.
Cycles and public transport into the Peak District
1. Hope Valley line – This is the main conduit for cyclists from Sheffield/Manchester but in theory only 2 bikes are permitted per train. Makes use of public transport for family or group cycle outings in the Peak District problematic. For individual cyclists too, uncertainty as to whether one will or won’t be able to board a train with a bike on a line where trains are mainly run on a 2-hourly service, obviously isn’t satisfactory. Restrictions could easily be lessened, at any rate outside peak hours? Trains should have “bike” stickers on the outside so cyclists know where to load their bikes – this decreases dwell times at stations, thus improving punctuality.
Northern Rail has setting up a Cycle Forum and Simon Geller is a member. This issue has been raised and a new cycle strategy states that guards can be ‘flexible’ over cycle carriage. It has been noted that fares are not always collected on this route and this may lead to a management perception that usage is lower than it actually is.
2. Possibility suggested of cyclists trains – on a similar model to folk trains? ACORP have suggested the use of defunct Pacers as bike vans, although CTC members may question whether the ride quality of these units is good enough to carry expensive touring bikes
3. Steps at stations – need to carry bikes across can be a deterrent to cyclists who are less agile/family groups. Hope is an example.
4. Availability of bike buses on routes where this would be especially likely to prove popular. 240 Sheffield – Bakewell buses could carry bikes and link with Monsal Trail. 272 to Castleton would also seem to be suitable – tickets on this service are interchangeable with rail services but the buses don’t carry bikes.
The Sheffield – Burbage Rocks – Hathersage – Bamford – Fairholmes runs on Sundays but is not very well publicised.
For cyclists preferring to remain on the road, a key issue is speed of motor traffic. Policy with regards to speed limits has been inconsistent, with little or no ‘joined-up thinking’ between Derbyshire and Sheffield. We understand that this is changing. Derbyshire has consistently been bringing speeds down on its major roads.
Roads where we would like to see lower limits are:-
A625 Baslow Rd
Ringinglow Rd
A57 Hollow Meadows
August 08 Update
There’s an article about motorised off-roading in the Peakland Guardian, the magazine of the Friends of the Peak District (CycleSheffield is is a member)
It basically explains how the off-road lobby have been exploiting the law to claim they have a legitimate case for using bridleways where they were once used by carts. They have applied to Derbyshure CC to have them converted to Byways Open To All Traffic (BOATS) This is done on the basis of historical usage not the appopriacy of the route for motorised traffic. Once this occurs DCC or the Peak Park Authority can reverse the decision through a Traffic Regulation Order (TRO.) – which the off-roaders can object to. Attempts to introduce a voluntary practice, as on the Long Causeway, have failed. The Peak Park has a new off-road strategy – http://www.peakdistrict.org/index/looking-after/vehicles.htm
This is clearly a cause for concern and something we need to keep an eye on.